Patent
New Technology
We create the future value of Civil engineering with constant R&D
9 | BAS method | No. 803 | 2016-11-15 |
8 | Crown Cap method | No. 730 | 2014-04-16 |
7 | Coil deposition type heat pump technology using both geothermal and water heat | No. 604 | 2012-04-26 |
6 | Construction method that replaces rail-type expansion joints with finger-type expansion joints by partially removing the concrete that has b | No. 552 | 2008-04-02 |
5 | Horizontality folding type erection method of bent style for bridge upper structure bearing | No. 551 | 2008-03-21 |
4 | Spherical bridge bearing installation and exchange method with detachable upper plate | No. 545 | 2007-11-23 |
3 | Soil nailing method using multi rebar stiffener and spring expansion equipment | No. 540 | 2007-09-28 |
2 | High pressure quick setting jato soil improving method using twin jet nozzle | No. 532 | 2007-04-18 |
1 | Pre-stressed girder manufacturing technology for H-steel along with Advanced high strength steel | No. 531 | 2007-04-04 |