Basic Design (change) for construction of the express railway (Samsung~Dongtan section)

Basic Design (change) for construction of the express railway (Samsung~Dongtan section)
Summary
 
Ordering organization
Client : Korea Rail Network Authority
Term
Term : 2015.12.22-2016.06.19