Basic/Detailed Design for Rehabilitation of Water Conveyance Pipeline between Sungsan P/S and Magok

Basic/Detailed Design for Rehabilitation of  Water Conveyance Pipeline between Sungsan P/S and Magok
Summary
 
Ordering organization
Client : Geukdong Engineering
Term
Term : 2014.06.09-2015.08.02