Design build(alternative design) for Honam high speed railway construction(section 1-2)

Design build(alternative design) for Honam high speed railway construction(section 1-2)
Summary
 
Ordering organization
Client : Korea Rail Network Authority
Term
Term : 2009.11.11-2999.12.31