Consultancy Services for Feasibility Study for the Second Circulation Expressway Construction in Metropolitan between Yangpyeong and Yicheon)

Consultancy Services for Feasibility Study for the Second Circulation Expressway Construction in Metropolitan between Yangpyeong and Yicheon)
Summary
 
Ordering organization
Client : Ministry of Land, Transport and Maritime Affairs
Term
Term : 2010.12.30-2012.03.23