Survey, Preliminary and detailed engineering design for 2018 old sewer pipe (Zone 1)

Survey, Preliminary and detailed engineering design for 2018 old sewer pipe (Zone 1)
Summary
 
Ordering organization
Client : Seoul
Term
Term : 2018-06-05 ~ 2019-09-30