Preliminary and Detailed Engineering Design for Water-Friendly River in Hwaseong-Dongtan (2)

Preliminary and Detailed Engineering Design for Water-Friendly River in Hwaseong-Dongtan (2)
Summary
 
Ordering organization
Client : Korea Land & Housing Corporation
Term
Term : 2016.10.10~2017.08.06