Detailed Engineering Design for Construction of National Highway No.14 (Hamyang ~ Changnyeong Section, Lot No.3)

Detailed Engineering Design for Construction of National Highway No.14 (Hamyang ~ Changnyeong Section, Lot No.3)
Summary
 
Ordering organization
Client : Doosan Engineering & Construction co., ltd.
Term
Term : 2016.10.31-2999.12.31