Detailed Engineering Design for Re-route of Deokcheon-dong ~ Asiad Main Stadium (3rd Mandeok Tunnel) Section Road

Detailed Engineering Design for Re-route of Deokcheon-dong ~ Asiad Main Stadium (3rd Mandeok Tunnel) Section Road
Summary
 
Ordering organization
Client : Dongbu Corporation co., ltd.
Term
Term : 2016.11.11-2017.01.31